The project took place over a six-month period, starting with the analysis of technical data and the construction of various possible scenarios, particularly around the design of the generic routing and then the sizing of the loops with the WipSim software.
Next, NTN Europe’s teams underwent Conwip method training, based on a situational exercise with the “Conwip Game®” and the presentation of various implementations from WIPSIM’s experience and expertise.
At the end of the training phase, a multidisciplinary working group was formed to design a prototype of a visual loop control board in the workshop. This board, designed for simple and efficient control of the two Conwip loops, also focused on readability and effectiveness to deal with the daily uncertainties inherent in complex productions.
The commitment of NTN Europe’s operators and project team, as well as WIPSIM consultants, was crucial to ensuring a rapid and effective adoption of the system.